Skip to content
Wayfinders

BrochuresEvacuation plans

Evacuation Plans

Evacuation plans drawn from your floorplans and fire cert, printed on fire-safety-approved materials and installed. One specialist, one fixed price.

Download PDF8 pages, A4

Evacuation plans

Evacuation plans. Sorted.

Designed, printed and installed by a wayfinding specialist, from your floorplans and fire certs to the frame on the wall.

Why it matters

The one drawing nobody reads until the alarm

An evacuation plan is a plan of the floor you are standing on, marked with your position, the routes out, the exits they lead to and the safety equipment along the way. Most buildings have them. Too many were drawn for the drawing office: north at the top, a legend in tiny type, and a red dot that could be anywhere.

You can hang that on a wall and satisfy an auditor. It won't help anybody find a stair. We draw each plan for the person reading it, facing the way they face, showing only what they need in the thirty seconds they'll give it.

Wayfinders handles strategy, design, compliance, manufacture and installation under one roof, so the plans come from the same team and the same drawings as the rest of your signage. No back-and-forth between suppliers.

Nobody studies the escape plan until the alarm. Then they read it once.

St Vincent's Private Hospital. The building's own Way Out blade brings people to the final exit.

Evacuation Plans2

What's on every plan

Everything a reader needs, nothing they don't

Every plan is custom, drawn from your floorplans and fire cert, and laid out to ISO 23601 with ISO 7010 safety symbols. A typical legend carries:

You Are Here

The reader's exact position, marked and labelled, with the plan rotated so it matches the way they are facing. The same floor is drawn differently for each mounting position.

Escape routes and exits

Primary and alternative routes from that position, traced straight off the fire strategy, leading to every emergency exit.

Refuges and call stations

Refuge points and disabled refuge call stations, shown where your fire strategy provides them, so people who can't use the stair know where to wait.

Fire safety equipment

Break glass units and the other equipment along the route, in the ISO 7010 symbol set. No house libraries, no redrawn running man.

A legend people can read

Every symbol explained at a size that works at standing reading distance, with core, block and level names matching the signs beside it.

Revision and issue date

A small, legible revision reference on the face of each plan, so a facilities manager or inspector can tell whether it predates the last fit-out.

St Vincent's Private Hospital. Site signage says Exit; the statutory sign is a green pictogram.

Evacuation Plans3

How it works

From floorplan to finished frame

You send the drawings. We handle the rest, and the plans are drawn, made and fitted by one contractor from one set of drawings.

  1. 01

    Send your floorplans and fire cert

    Email us the floorplans and the fire certificate drawings. That is what every route, exit, refuge and piece of equipment is traced from.

  2. 02

    We set out the positions

    Each mounting position gets its own location code, rotation and You Are Here marker, and its own line in the sign schedule.

  3. 03

    We draw the plans

    Custom evacuation plans, oriented to the reader, with naming taken from the same schedule as your door and directional signs.

  4. 04

    You approve

    Plans go to you, and to your fire consultant if you have one, for review. Comments and revisions are tracked against each plan.

  5. 05

    We print them

    High-quality prints on durable, fire-safety-approved materials, ready for installation on site.

  6. 06

    We install them

    Our own fitting teams mount every plan in the right location, at the right height, with the right finish.

Evacuation Plans4

Our platform

Every plan tracked, every revision on record

Every evacuation plan is a unique artwork, so forty positions means forty plans. We manage them on our own platform, the same one that runs our full wayfinding packages.

Each plan has its own record: where it hangs, which revision is current, who approved it and when it was installed. When the building changes, the re-issue starts from that record.

Per-plan approval

Approval state, comments and revision history for each plan, so nothing is signed off by accident or lost in an email thread.

Placed on the drawings

Mounting positions are set out on the floorplans, so the schedule, the artwork and the installation all point at the same location.

A record for the building

At handover you get the schedule and installation record, ready for the fire safety register and the next re-issue.

Our platform showing a residential ground floor plan with every sign plotted and labelled by type, and the artwork for a block identification sign in the sidebar
Design approval view for a UCD exterior lettering submittal marked approved by the client, with the branded visuals pack and page list
1.8Design rounds to approval, on average
Evacuation Plans5

Track record

Compliance is the part we don't get wrong

100%Statutory sign-off. We have never failed a certification inspection
10,000+Residential units designed, certified and installed
260+Healthcare institutions
18+Full university campus rollouts

Contractors we work with

  • John Sisk & Son
  • JJ Rhatigan
  • Elliott Group
  • Collen Construction
  • John Paul Construction
  • Ballymore
Evacuation Plans6

Questions

What people ask us first

What do you need from us?

Your floorplans and fire certificate drawings. Escape routes, exits, refuges and equipment are traced straight off them.

Are evacuation plans a legal requirement in Ireland?

Not under the Building Regulations; TGD B covers escape signage, not a framed plan. The duty comes from the occupied building: Section 11 of the Safety, Health and Welfare at Work Act 2005 and Section 18 of the Fire Services Act 1981.

Which standards do you work to?

ISO 23601 for the plan's content, orientation and minimum scale, and the ISO 7010 safety-sign set for every symbol on it.

Who is it for?

Apartment developments new or existing, property managers upgrading compliance on a live building, contractors who want one package, and fire consultants who need a plan executed as specified.

How is it priced?

A simple fixed price per apartment, agreed up front. Send us your floorplans and we'll quote.

What happens when the building changes?

Every plan carries a revision reference. A fit-out, change of use or new escape strategy should trigger a re-issue, and we can make that a maintenance item with an owner.

Evacuation Plans7

Tick evacuation plans off your list

Email us your floorplans and fire cert and we'll handle the rest: drawn, printed, installed, at one fixed price.

DublinWayfinder HouseBaldoyle Industrial EstateDublin 13D13 H6E5+353 (1) 832 6966
Belfast20 Bridge RoadMoiraCo. DownBT67 0PF+44 2030 260034
London23 Clerkenwell GreenClerkenwellLondonEC1R 0NA+44 2030 260034
wayfindersgroup.com